Retrofit Submetering
Already have a building? We can add submetering with minimal disruption to your residents and operations.
Get StartedHow Retrofit Submetering Works
Retrofit submetering adds individual meters to an existing building's electrical system. Our team surveys your building, designs a meter layout that works with your existing infrastructure, and installs meters with minimal disruption to residents. The process typically takes a few weeks depending on building size.
The Retrofit Process
We follow a structured approach: (1) Free building assessment to evaluate your electrical system, (2) Custom design for meter placement and wiring, (3) Resident communication plan developed with your team, (4) Installation scheduled to minimize disruption, typically requiring brief access to each unit, (5) System testing and commissioning, (6) Resident onboarding and account setup.
Minimizing Disruption
We understand residents are already living in your building. Our installation teams work during scheduled hours, provide advance notice to affected units, and complete work as quickly as possible. Most unit-level work requires only 30 to 60 minutes per suite.
Common Building Types We Retrofit
Voltage Vision has experience retrofitting condominiums, rental apartments, co-operative housing, and mixed-use buildings. Whether your building has 20 units or 500, we design a solution that works with your existing electrical infrastructure.
Frequently Asked Questions
Can any existing building be retrofitted with submeters?
Most multi-residential buildings can be retrofitted. During our free building assessment, we evaluate your electrical system to determine the best approach. Some older buildings may require minor electrical upgrades, which we can discuss during the assessment.
How long does a retrofit installation take?
Installation timelines vary by building size and complexity. A typical 100-unit building takes approximately 2 to 4 weeks from start to completion. We provide a detailed timeline during the planning phase.
Will residents lose power during installation?
Brief power interruptions (typically 15 to 30 minutes) may be required during meter installation. We schedule these in advance and coordinate with property management to minimize inconvenience.
Related Services
Electricity Submetering
Suite-level electricity metering for multi-residential buildings. Each unit is individually metered so residents pay only for the electricity they use.
New Construction Submetering
Submetering designed into your building from the ground up. The most cost-effective and least disruptive approach to individual metering.
Billing Services
Full-service utility billing management. We handle meter reading, bill generation, distribution, collections, and resident support.
Ready to Learn More?
Contact us for a free building assessment. No commitment required.
Contact Voltage Vision