Golden Horseshoe · Burlington Hydro

Submetering in Burlington

Burlington's downtown intensification and lakefront developments have brought new multi-residential buildings that benefit from submetering. Fair, transparent billing helps Burlington property managers maintain resident satisfaction while promoting energy conservation.

Why Submetering

Why Burlington Buildings Choose Submetering

According to a Navigant study, sub-metered buildings may see up to 40% reduction in suite electricity consumption. For Burlington property managers, submetering means removing electricity from your operating expenses and letting each resident pay only for what they use.

Fair Billing

Each unit pays for their own electricity consumption. No more equal-split disputes or subsidizing heavy users.

Zero Installation Cost

Voltage Vision covers the entire meter installation. No capital expenditure required from your building.

Conservation

Studies suggest up to 40% consumption reduction. When residents see their own usage, they tend to conserve more.

Working With Burlington Hydro

Voltage Vision works alongside Burlington Hydro, your local distribution company in Burlington. Electricity delivery charges from Burlington Hydro are passed through to residents with no markup, as required by the OEB Unit Sub-Metering Code. Our service charges are separate and clearly disclosed.

What appears on resident bills:

  • Electricity consumption based on individual meter reading
  • Delivery charges from Burlington Hydro (passed through, no markup)
  • Voltage Vision service charges (separately listed)
  • Historical consumption data for comparison

Submetering FAQ for Burlington

What is submetering in Burlington?

Submetering in Burlington allows each unit in a multi-residential building to be individually metered for electricity. Instead of splitting costs equally, residents pay only for the electricity they actually use. This promotes fairness and may encourage conservation.

Is Voltage Vision licensed to operate in Burlington?

Yes. Voltage Vision holds Ontario Energy Board Licence ES-2024-0359, which authorizes us to provide submetering services throughout Ontario, including Burlington and the Golden Horseshoe region.

What is the cost of submetering installation in Burlington?

Voltage Vision covers the cost of meter installation at zero capital cost to the building. There are no upfront fees for equipment or installation. Residents pay for their electricity consumption plus applicable service charges as disclosed in our Conditions of Service.

Who is the local utility in Burlington?

Burlington is served by Burlington Hydro. Voltage Vision works alongside your local utility. Electricity delivery charges from Burlington Hydro are passed through to residents with no markup, as required by the OEB Unit Sub-Metering Code.

Can existing Burlington buildings be retrofitted with submeters?

Yes. Voltage Vision can retrofit existing buildings in Burlington with individual meters. We start with a free building assessment to evaluate your electrical system and design a solution that works with your existing infrastructure.

Submetering in Nearby Cities

Ready to Get Started in Burlington?

Book a free building assessment. No commitment, no cost.