Eastern Ontario · Hydro Ottawa

Submetering in Ottawa

As the nation's capital, Ottawa has a mature multi-residential market with both government-adjacent condos and a strong rental sector. Submetering in Ottawa helps property managers provide equitable billing across diverse building types, from high-rise towers to mid-rise developments.

Why Submetering

Why Ottawa Buildings Choose Submetering

According to a Navigant study, sub-metered buildings may see up to 40% reduction in suite electricity consumption. For Ottawa property managers, submetering means removing electricity from your operating expenses and letting each resident pay only for what they use.

Fair Billing

Each unit pays for their own electricity consumption. No more equal-split disputes or subsidizing heavy users.

Zero Installation Cost

Voltage Vision covers the entire meter installation. No capital expenditure required from your building.

Conservation

Studies suggest up to 40% consumption reduction. When residents see their own usage, they tend to conserve more.

Working With Hydro Ottawa

Voltage Vision works alongside Hydro Ottawa, your local distribution company in Ottawa. Electricity delivery charges from Hydro Ottawa are passed through to residents with no markup, as required by the OEB Unit Sub-Metering Code. Our service charges are separate and clearly disclosed.

What appears on resident bills:

  • Electricity consumption based on individual meter reading
  • Delivery charges from Hydro Ottawa (passed through, no markup)
  • Voltage Vision service charges (separately listed)
  • Historical consumption data for comparison

Submetering FAQ for Ottawa

What is submetering in Ottawa?

Submetering in Ottawa allows each unit in a multi-residential building to be individually metered for electricity. Instead of splitting costs equally, residents pay only for the electricity they actually use. This promotes fairness and may encourage conservation.

Is Voltage Vision licensed to operate in Ottawa?

Yes. Voltage Vision holds Ontario Energy Board Licence ES-2024-0359, which authorizes us to provide submetering services throughout Ontario, including Ottawa and the Eastern Ontario region.

What is the cost of submetering installation in Ottawa?

Voltage Vision covers the cost of meter installation at zero capital cost to the building. There are no upfront fees for equipment or installation. Residents pay for their electricity consumption plus applicable service charges as disclosed in our Conditions of Service.

Who is the local utility in Ottawa?

Ottawa is served by Hydro Ottawa. Voltage Vision works alongside your local utility. Electricity delivery charges from Hydro Ottawa are passed through to residents with no markup, as required by the OEB Unit Sub-Metering Code.

Can existing Ottawa buildings be retrofitted with submeters?

Yes. Voltage Vision can retrofit existing buildings in Ottawa with individual meters. We start with a free building assessment to evaluate your electrical system and design a solution that works with your existing infrastructure.

Ready to Get Started in Ottawa?

Book a free building assessment. No commitment, no cost.