PickeringNew Construction

New Construction Submetering in Pickering

Building new? Incorporating submetering into your design from the start is the most efficient approach. We work with your development team to design, install, and commission meters before occupancy.

Benefits of New Construction Submetering in Pickering

Integrated into building design from day one

Lower complexity compared to retrofits

Ready for occupancy with metering in place

Zero capital cost to the developer

Seamless transition to billing at occupancy

Compliant with all applicable codes and standards

Pickering Utility Information

Pickering is served by Elexicon Energy. Voltage Vision works alongside Elexicon Energy to provide submetering services for new construction in the Durham Region region.

According to a Navigant study, sub-metered buildings may see up to 40% reduction in suite electricity consumption.

Utility pass-through charges from Elexicon Energy are passed through with no markup, as required by the OEB Unit Sub-Metering Code. Voltage Vision service charges are separate and clearly disclosed.

New Construction Submetering FAQ for Pickering

When should submetering be incorporated into the design?

The earlier the better. Ideally, metering is considered during the electrical design phase so that meter locations, communications pathways, and data infrastructure are built in rather than added later.

Does Voltage Vision work directly with the electrical contractor?

Yes. We coordinate with your electrical contractor and engineering team to ensure metering is installed correctly and tested before occupancy.

Ready for New Construction Submetering in Pickering?

Free building assessment. No commitment, no cost.