Submetering in Thunder Bay
Thunder Bay's multi-residential sector, including Lakehead University housing, benefits from submetering for transparent billing. In Northern Ontario's climate, individual metering encourages responsible electricity use.

Why Submetering
Why Thunder Bay Buildings Choose Submetering
According to a Navigant study, sub-metered buildings may see up to 40% reduction in suite electricity consumption. For Thunder Bay property managers, submetering means removing electricity from your operating expenses and letting each resident pay only for what they use.
Fair Billing
Each unit pays for their own electricity consumption. No more equal-split disputes or subsidizing heavy users.
Zero Installation Cost
Voltage Vision covers the entire meter installation. No capital expenditure required from your building.
Conservation
Studies suggest up to 40% consumption reduction. When residents see their own usage, they tend to conserve more.
Working With Thunder Bay Hydro
Voltage Vision works alongside Thunder Bay Hydro, your local distribution company in Thunder Bay. Electricity delivery charges from Thunder Bay Hydro are passed through to residents with no markup, as required by the OEB Unit Sub-Metering Code. Our service charges are separate and clearly disclosed.
What appears on resident bills:
- Electricity consumption based on individual meter reading
- Delivery charges from Thunder Bay Hydro (passed through, no markup)
- Voltage Vision service charges (separately listed)
- Historical consumption data for comparison

Our Services in Thunder Bay
Whether you are building new or retrofitting existing properties, we have a solution for your Thunder Bay building.
Electricity Submetering
Suite level electricity metering for multi residential buildings. Each unit is individually metered so residents pay only for the electricity they use.
Water Submetering
Individual water metering for multi residential buildings. Promote water conservation and fair billing based on actual usage.
Thermal Submetering
Individual heating and cooling measurement for multi residential buildings. Fair allocation of thermal energy costs based on actual suite level consumption.
Electric Vehicle Charging
EV charging metering for multi residential buildings. Each charging station is individually metered so EV owners pay only for the electricity they consume.
Submetering FAQ for Thunder Bay
What is submetering in Thunder Bay?
Submetering in Thunder Bay allows each unit in a multi-residential building to be individually metered for electricity. Instead of splitting costs equally, residents pay only for the electricity they actually use. This promotes fairness and may encourage conservation.
Is Voltage Vision licensed to operate in Thunder Bay?
Yes. Voltage Vision holds Ontario Energy Board Licence ES-2024-0359, which authorizes us to provide submetering services throughout Ontario, including Thunder Bay and the Northern Ontario region.
What is the cost of submetering installation in Thunder Bay?
Voltage Vision covers the cost of meter installation at zero capital cost to the building. There are no upfront fees for equipment or installation. Residents pay for their electricity consumption plus applicable service charges as disclosed in our Conditions of Service.
Who is the local utility in Thunder Bay?
Thunder Bay is served by Thunder Bay Hydro. Voltage Vision works alongside your local utility. Electricity delivery charges from Thunder Bay Hydro are passed through to residents with no markup, as required by the OEB Unit Sub-Metering Code.
Can existing Thunder Bay buildings be retrofitted with submeters?
Yes. Voltage Vision can retrofit existing buildings in Thunder Bay with individual meters. We start with a free building assessment to evaluate your electrical system and design a solution that works with your existing infrastructure.
Ready to Get Started in Thunder Bay?
Book a free building assessment. No commitment, no cost.