Northern Ontario · New Construction

New Construction Submetering in Thunder Bay

Building new? Incorporating submetering into your design from the start is the most efficient approach. We work with your development team to design, install, and commission meters before occupancy.

New Construction buildings in Thunder Bay, Ontario

Why Submetering

Why Thunder Bay Buildings Choose Submetering

According to a Navigant study, sub-metered buildings may see up to 40% reduction in suite electricity consumption. For new construction in Thunder Bay, submetering means removing electricity from your operating expenses and letting each unit pay only for what they use.

Fair Billing

Each unit pays for their own electricity consumption. No more equal-split disputes or subsidizing heavy users.

Zero Installation Cost

Voltage Vision covers the entire meter installation. No capital expenditure required from your building.

Conservation

Studies suggest up to 40% consumption reduction. When residents see their own usage, they tend to conserve more.

Working With Thunder Bay Hydro

Voltage Vision works alongside Thunder Bay Hydro, your local distribution company in Thunder Bay. Electricity delivery charges from Thunder Bay Hydro are passed through to residents with no markup, as required by the OEB Unit Sub-Metering Code. Our service charges are separate and clearly disclosed.

What appears on resident bills:

  • Electricity consumption based on individual meter reading
  • Delivery charges from Thunder Bay Hydro (passed through, no markup)
  • Voltage Vision service charges (separately listed)
  • Historical consumption data for comparison
New Construction building served by Thunder Bay Hydro in Thunder Bay

Our Services in Thunder Bay

Whether you are building new or retrofitting existing new construction properties, we have a solution for your Thunder Bay building.

New Construction FAQ for Thunder Bay

When should submetering be incorporated into the design?

The earlier the better. Ideally, metering is considered during the electrical design phase so that meter locations, communications pathways, and data infrastructure are built in rather than added later.

Does Voltage Vision work directly with the electrical contractor?

Yes. We coordinate with your electrical contractor and engineering team to ensure metering is installed correctly and tested before occupancy.

← All submetering services in Thunder Bay

Ready for New Construction Submetering in Thunder Bay?

Book a free building assessment. No commitment, no cost.

Contact UsCall (416) 857-9547